Well, we've been doing lots of projects at the house recently. Let me see if I can recap some of them...Replaced 3 back windows & had stucco repaired, replaced window trimmer studs in master bedroom, repaired sheet rock, painting, and lots of work in the hall bathroom. While our bedroom window wall was being worked on, we moved into the guest room. Today, we had 10 low voltage recessed lighting put into the living room/dinning room and when Patrick & I got home he painted the bathroom while I prepared our master bedroom, so that we were able to move back in. Now it's time to decorate!!!
Sunday, November 23, 2008
November Vacation to Cambria
Subscribe to:
Posts (Atom)